local_shippingFree EU delivery over €150 autorenew14-day returns on stock items verified_userEN 12195 certified support_agentMon–Fri 08:00–18:00
Track order Help EN · EUR
✓ In stock

Scaffold Sheeting 20 Rolls/Pallet – 3m x 45m Reinforced UV-Stabilised (€69.95/roll)

Reinforced scaffold sheeting in the wider 3m format, for weather protection and debris containment on tube & fitting and modular scaffold systems. Waterproof and UV-stabilised, with reinforced banding and eyelets along the length of ...

€1.399,00 / unit · excl. VAT
€69.95/roll · Free EU shipping
💡 Buying 3+ pallets? Ask for volume pricing — full trailer loads available. Request a quote above.
Free EU shipping over €150 30-day returns Secure checkout
EN 12195-2VDI 2700ISO 9001 supplier

Reinforced scaffold sheeting in the wider 3m format, for weather protection and debris containment on tube & fitting and modular scaffold systems. Waterproof and UV-stabilised, with reinforced banding and eyelets along the length of the roll so you can vary the tying frequency to match the wind exposure on the job.

The 3m width covers more lift height per roll than the 2m format, which means fewer horizontal joins, less overlap waste and faster installation on taller elevations. Sold per pallet of 20 rolls at direct B2B pricing, with the roll price shown up front. Stocked in the EU.

Specifications

  • Roll size: 3m x 45m
  • Coverage per roll: 135 m²
  • Coverage per pallet: 2,700 m²
  • Material: Reinforced polyethylene sheeting
  • Properties: Waterproof, UV-stabilised
  • Fixing: Reinforced banding with eyelets; secure with shock cord ties or elasticated toggles (sold separately)
  • Pallet quantity: 20 rolls

Applications

  • Weather protection on scaffolding — rain, wind and dust
  • Debris and waste containment on facades and refurbishment work
  • Screening on residential, commercial and heritage sites
  • Temporary enclosures and containment areas

Important: sheeting changes the wind load on your scaffold

A sheeted scaffold catches wind that an open scaffold lets through, and the forces transferred into the ties, standards and the building facade increase substantially. Sheeting carries a considerably higher load than debris netting, so a scaffold designed as open — or designed for netting — must be re-checked before it is sheeted. Extra ties are often required. Scaffold design in Europe follows EN 12811; in the UK, TG20 compliance sheets cover sheeted configurations. Check with your scaffold designer before ordering.

Fixing and use

  • Fix through the reinforced banding, never through the plain sheet.
  • Use shock cord ties or elasticated toggles rather than cable ties — they absorb movement instead of tearing.
  • Overlap adjacent rolls and tie through both layers so wind and water cannot get behind the sheet.
  • Tension evenly. Loose sections act as a sail and concentrate load at the fixings.
  • Inspect after every storm and after any lift adjustment.
  • Remove from the top down as the scaffold comes down.

This product is for weather protection and debris containment. It is not fall-arrest safety netting, which is a separate product tested to EN 1263-1.

For project quantities, mixed pallets or the technical data sheet, contact info@sorbpack.com.